industrial and plant engineering

In cooperation with MATTHÄI Stendal GmbH, ibb GmbH manufactured and installed an enclosure of the evaporation facility of Zellstoff Stendal GmbH in Arneburg.
In September 2015 ibb completed the enclosure of the evaporation facility of Zellstoffwerk Stendal GmbH. This project was carried in collaboration with MATTHÄI GmbH.


The hoof trimming chute manufactured at ibb offers the following advantages:

Im September 2015 hat ibb die Einhausung der Eindmapfanlage in der Zellstoffwerk Stendal GmbH fertiggestellt. Dieses Projekt wurde gemeinsam mit der MATTHÄI GmbH durchgeführt.


transport bridge
elevated connecting bridge at a height of approx. 4,70 m with a cross section w / h: approx. 3,50 / 4,00 m for conveyor belt systems at the shipping center of HEXAL in Barleben
Length of bridge: ca. 25,0 m
Scope of services
full service package in steel and facade work
facade cladding (ISO wall-panels)
Roof covering (ISODACH panel)
elevated connecting bridge at a height of approx. 4,0 m with a cross section w / h: approx. 2,60 / 3,10 m for conveyor belt systems at the parcel center of DHL in Hamburg
Length of bridge:

Reconstruction of balconies at Krähenhoop 13 in Wolfsburg
